Buildings

Form structures that stand tall

From universities to residential high-rises, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

Focus Project

Building Projects

Lascaux IV - Centre International d’Art Pariétal (CIAP): Overall view of the museum complex. Through the TRIO panel formwork, the high requirements on the concrete surfaces have been fully met.
Earthquake-proof shoring solution for the Stavros Niarchos Foundation Cultural Center building in Athens. Designed by the Architect Renzo Piano.
Centre Pompidou, Metz, France - The tent-like roof construction reached a height of 77 m. For the up to 32 m high PERI UP Rosett shoring towers, adapting to the complex roof geometry was carried out using system components from the VARIOKIT engineering construction kit.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Museum of Tomorrow, Rio de Janeiro - For realising the extraordinary museum on time and within budget, PERI planned, produced and delivered over 3,500 customised special formwork elements.
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
St. Martins Therme & Lodge, Frauenkirchen, Austria - With formwork and scaffolding systems perfectly matched each structural component, the concrete frame could be completely finished in only 9 months.
UTEC University Campus, Lima, Peru - With the help of the customized PERI formwork and scaffolding solution, a new campus complex is being realized in Lima – with high architectural requirements and a tight construction schedule.
Bosjes Chapel
Slabs formed with PERI MULTIFLEX
CCI Call Centre
Growthpoint Properties and Illovo Sugar Head Office
Crossings Shopping Complex
Riverside Office Park
Ilanga Mall
Toyota Richards Bay
Alex Mall
Ghana Revenue Authority Head Office
Bisho offices phase 2
 SWARTLAND EIENDOMME New Head Office
Barlow Park
Galileo Satellite Control Centre, Oberpfaffenhofen, Germany - The outside of the building resembles a medieval fortress. The facade is comprised of window openings as well as pre-determined regular tie points and horizontal pilaster strips.
First PERI RCS project in South Africa - Alice Lane Phase 3
Discovery Head Office with PERI Systems
Creative formwork for energy giant - Sasol’s new head office in Sandton
Key West Apartments, Milnerton, Cape Town - total PERI formwork solution for upmarket apartment building
Bisho Offices
Zimbali Suites
Richards Bay Medical Center
Ngewelezane Hospital
PERI Centurion offered a complete package for Trencon Construction, by providing design, site supervision and transport in addition to supplying a range of PERI products and conventional equipment for the various solutions required to successfully construct this intricately designed structure.
IDZ Yekani
Improved Safety = Faster Slab Turnaround
The Dune Project
PEP Props, SKYDECK an other PERI systems have been used at Discovery Head Office

Would like to work with PERI on your next project?

Call us on +27 (0)21 880 7777 to discuss your requirements further.